Backfill Scheduling For Embarrassingly Parallel Jobs

  • Published: Jun 25, 2015
  • Earliest Priority: Dec 23 2013
  • Family: 8
  • Cited Works: 3
  • Cited by: 7
  • Cites: 2
  • Additional Info: Cited Works Full text
Abstract

Backfill scheduling for embarrassingly parallel jobs. A disclosed method includes: receiving an initial schedule having a plurality of jobs scheduled over time on a plurality of nodes, determining that a first job can be split into a plurality of sub-tasks that can respectively be performed in parallel on different nodes, splitting the first job into the plurality of sub-tasks, and moving a first sub-task from its position in the initial schedule to a new position to yield a first revised schedule.


Claims
Download PDF
Document Preview
Document History
  • Publication: Jun 25, 2015
  • Application: Dec 23, 2013
    US US 201314138239 A
  • Priority: Dec 23, 2013
    US US 201314138239 A

Download Citation


Sign in to the Lens

Feedback